Usage/Application | Industrial |
Packaging Size | 20L |
Finish | Matt |
State/Form | Liquid |
Brand | Reliable Paints |
Drying Time | 25-30minutes |
Theoretical Coverage | 12.00 sq.mt/ltr at recommended DFT of 40Mu |
Shelf Life | 9months |
Solids By Volume | 48+-3% |
Flash Point Base | 230 deg C |
Brand | Reliable Paint |
Usage/Application | Industrial |
Packaging Size | 20-50L |
Finish | Matt |
Application Method | Roller |
Shelf Life | 9 month |
Flash Point | 23deg C |
Theoretical Coverage | 14 sq.mt/ltr at recommended DFT of 40Mu |
Solids By Volume | 56+-3% |
Surface Drying Time | 20-30minutes |
Minimum Order Quantity | 40 Litre |
Brand | Reliable Paints |
Usage/Application | Industrial |
Packaging Size | 20 ltrs |
Type | Anticorrosive primer |
Color | any shade |
Finish | Matt |
Solids By Volume | 52+-3% |
Theoretical Coverage | 13 sq.mt/ltr at recommended DFT of 40Mu |
Flash Point | 23deg C |
Shelf Life | 9month |
Surface Dry Time | 20-30minutes |
Two component air drying Polyamide cured Epoxy primer containing zinc phosphate as anti corrosive pigment. Recommended as a primer for suitably cleaned MS and concrete surface in OEM equipment painting as well as an anti corrosive primer in Process industries like fertilizer plants, Refineries, Petrochemical complexes for protection of steel pipelines and structures from corrosion. The primer is recommended for architectural coatings. This primer is recommended for use on concrete surfaces and also the primer withstands high chemical resistance and it is recommended for the atmospheres where the water is highly saline.
Brand | Reliable Paints |
Finish | Matt |
Application Method | Brush, Sir Spray, airless spray |
Shelf Life | 9 Months At 25 deg C |
Flash Point | 23deg C |
Solids By Volume | 45+-3% |
Theoritical Coverage | 15.00 sq.mt/ltr at recommended DFT of 30Mu |
Thinner | REP Thinner 301 |
Brand | Reliable Paints |
Finish | Matt |
Pot Life | 6 hours at 30deg C |
Solids By Volume | 52+-3% |
Theoritical Coverage | 13 Sq.Mt/Ltr At Recommended Dft Of 40Mu |
Flash Point Base | 23deg C |
Flash Point Hardener | 23deg C |
Flash Point Mixed | 23deg C |
Surface Drying Time | 25-30minutes |
Hard Drying Time | 24hour |
Shelf Life | 9month |
Thinner | REP T 03 |
Two component air drying Polyamide cured Epoxy universal primer containing zinc phosphate as anti corrosive pigment. Recommended as a primer for suitably cleaned MS, GI, Aluminium & Stainless steel surfaces, in OEM equipment painting as well as an anti corrosive primer in Process industries like fertilizer plants, Refineries, Petrochemical complexes for protection of steel pipelines and structures from corrosion.
Surface Preparation: Remove grease, oil and other contaminants preferably using Degreasing solvent. Blast clean to a minimum of Sa 21 /2 Swedish Standard SIS 05 5900 with a surface profile not exceeding 65 microns. If Blasting is not possible, make full use of mechanical devices along with manual chipping and wire brushing to remove loose rust and scale to St. 2 Swedish Standard SIS 05 5900. Excessive burnishing of steel is to be avoided. Thoroughly dust down all surfaces.